Stadiumbuilder

July, August 2009

Home
Yankee Stadium Replica, Fall 2011
Yankee Stadium Model, Summer 2011
Yankee Stadium Model, Spring 2011
The Yankee Stadium Model To Do List...
Winter 2010, 2011
Summer, Fall 2010
May, June 2010
March, April
Jan, Feb 2010
December 2009
November 2009
September 2009
July 2009
June 2009
May 2009
March 2009
February 2009
January 2009
December 2008
November 2008
October 2008
September 2008
August 2008
June 2008
May 2008
April 2008
March 2008
About Me
Contact Me

The summer was spent building and installing seating, so there wasn't a need for many new pictures during this period. The one significant thing I worked on besides the seats was the back bleacher wall. Photos of that wall under the elevated subway line are scarce and it took a lot of searching and some help from friends to finally put all the pieces of that puzzle together.  The photos on this page range from the beginning of July to the last day of August. Although it doesn't look it in the pictures, those short sections of frieze are about 130 pieces and the long sections over 250 parts each,. It takes 5-6 hours of work time per section, not counting drying time in between steps. I'd always get a real sense of accomplishment everytime I could call another finished and hang it up there. They'll be reset and leveled when the rafters and roof go in.

DSC03291.JPG

DSC03299.JPG

DSC03397.JPG

stadiumaug31003.jpg