With basic grandstand constuction finished, I turned
my attention to getting the bleachers started. To this point, I've been putting in an average of 3 hours a day work on this
and it was time for a vacation, so this ended up being a 3 week work month. You may have noticed the outer wall was removed.
At the end of July I had felt that something didn't look quite right with the vertical relationship between the upper
deck and mezzanine, and as it turned out, the upper stand had been built about two scale feet too high. My first major glitch.
I had to cut it loose and drop it down. A two day nightmare, but when I was done, it finally looked right.


|